Engineering

  • Engineering
    • Projects
    • Mechanical
    • CFD & Surge Analysis
    • Pulsations & Vibrations
    • Fiberglass Engineering
    • Geothermal Wells
  • Software
    • BOSfluids
    • BOSpulse
    • FEPipe
    • NozzlePRO
    • FEATools
    • Jive
    • ISOtracer
    • BOSview
    • BOS B31
  • Training
  • Career
  • News
  • Contact
Skip to content

Engineering

Dynaflow Research Group
  • Engineering
    • Projects
    • Mechanical
    • CFD & Surge Analysis
    • Pulsations & Vibrations
    • Fiberglass Engineering
    • Geothermal Wells
  • Software
    • Flow Analysis
      • BOSfluids
      • BOSpulse
    • Structural Analysis
      • FEPipe
      • NozzlePRO
      • FEATools
    • Academic
      • Jive
    • Tools
      • ISOtracer
      • BOSview
      • BOS B31
  • Training
  • Career
  • News
  • contact

Fiberglass piping design and installation for a petrochemical plant

10 Dec 2020

DRG provides a complete set of engineering and consultancy services for Fiberglass piping (FRP) networks. This includes detailed engineering studies, product development, factory audits, site supervision, FEED support, third-party review for EPC projects and root-cause investigation of failures.

DRG recently completed a third-party review project for the construction of a large petrochemical plant in Oman. This included an assessment of procured materials and factory audits, review of all engineering, drawings and other preparation, as well as weekly site supervision visits to cover activities such as jointing and hydrotesting. Also during these visits, assistance is provided by solving and engineering the difficulties that may occur at site, where the reality is always more tenacious than anticipated during the engineering phase.

The project was executed from the Middle East office of DRG. “With such large projects there are many different parties and people involved that mistakes are easily made”, explains Edwin Schimmel. “Because the engineering reviews, factory audits and site inspections are performed all by the same team from DRG, mismatches between design and practice are easily recognized. The installation of the Cooling Water system and Firewater system was completed troublefree late 2019.

For more information, please contact:

Edwin Schimmel
Project Engineer Engineer

Phone: +971 (0)4 447 4479

The post Fiberglass piping design and installation for a petrochemical plant appeared first on Dynaflow Research Group.

Related news

16 July 2021

Corrosion Resistant Alternative for Geothermal Well Casings

READ INFO
14 May 2021

Dynaflow to join Industry Insights with Hexagon PPM and Stressman Engineering

READ INFO
13 April 2021

Webinar series: Power Your Dynamic Stress Analysis with BOSfluids and CAESAR II

READ INFO
  • Dynaflow Dynaflow Research Group is ISO:9001 certified.
    ISO 9001:2015
    certified
  • HEAD OFFICE

    Laan van Oversteen 20
    6th floor
    2289 CX Rijswijk
    The Netherlands

  • MIDDLE EAST OFFICE

    Bay X2 Tower, Unit 3109
    Jumeirah Lakes Towers, cluster X
    P.O. Box 73001, Dubai
    United Arab Emirates

  • CONTACT

    Phone: +31 (0)85 058 0046
    E-mail: infoaanvraag@dynaflow.com

  • © Dynaflow Research Group BV

    • Terms & Conditions
    • Privacy policy
    • Cookie policy (EU)
    • About us
    • Contact